Nezávazně poptat
We offer the plots for sale, with Zoning Permit documentation and provision of turnkey solution for building A+-class warehouses close to the town Lavičky by the city Velké Meziříčí.
According to the study, it is possible to build, for example, 2 halls of about 10,000 square meters.
Obtaining Zoning Permit will take 6-12 months.
Possibility of using own generated electricity and heat from the cogeneration unit.
The land is located close to the D1 in the middle of the Czech Republic right at the motorway exit D1 No. 141 Velké Meziříčí – West.
The total area of the prepared zone is 5 ha. The location has a very good visible from the D1 motorway and excellent transport accessibility.
Total estimated costs:
The price of the land – CZK 64 million (47.990 m2 = 1.333 CZK / m2)
Cost for building readiness – est. 59mil. CZK
The price of the construction of the halls according to the gross calculation (2x 10k m2, 12.000 / m2) – 240mil. CZK
Total preliminary price for this project is 363,000,000 CZK
Territory use:
The Industrial Zone of the Bench is designated as Zone Z22 (VL – Light Industry) in the valid Lavikal Territorial Plan, issued on 25 May 2016. The land use plan permits the use of areas for construction and equipment for production and storage, construction, repair, production and non-production services, crafts, commercial activities, agricultural production, transport and technical infrastructure, greenery, collective and hall garages, fuel stations,
The build-up coefficient is not set, the height of buildings is max. 12.5 m.
Infrastructure:
The locality will be connected by a service road designed for heavy freight transport from road no. III / 0027, which directly follows the road II / 602 resp. on the D1 motorway. A building permit has already been issued for part of the service road. HV power connection is directly on the land, the zoning permit is issued on the gas station from the High Pressure to Middle-Pressure (capacity 200 m3 / h) and the Zoning Permit for connection to the water supply lines. Rainwater disposal will be done through land retention on the watercourse, the sewage disposal will be through a small WWTP – prospectively, the connection to the sewerage lines planned to build the town of Velké Meziříčí in the period 2017-2020
Project 2 halls:
In accordance with the ZP, the documentation was prepared for the construction of 2 halls of high technical standard – A +, intended for storage or light production.
Documentation on demand.
Senior Consultant | Industrial Leasing
+420 725 927 576 daniel@rapak-co.com Call meWe do have. Please, leave us your contact and we will contact you and help you find the right space.